Est. 1973
The Indian government has set very high targets for the power sector in the 13th five-year plan, besides trying to achieve the target set for the 12th five-year plan. Consequently, the transmission network will have to match the installed power generation capacity. But while there has been an increase in demand for Electrical Power Generation & Transmission, there exist a few hindrances, which include:
-
High cost to install new Power lines
-
Difficulty in acquiring Tower sites
-
Right of way (ROW)
-
Time involved in constructing new Power lines
-
Provision for future contingencies
Est. 1973
Quality
A team of qualified personnel with requisite testing instruments conduct tests on as per the Quality Assurance Plan duly approved by the customers or as per the specifications of client ensuring desired properties of Chemical, Electrical and Mechanical in the Conductor.
All acceptance and routine tests are carried as per IS 398-Part-1,2,4&5 and the Type tests of the Conductors from leading & recognized laboratories viz. NSIC,Kolkata,M/s TAG Corporation, Chennai and ERDA,Mumbai.
CERTIFIED
OHSAS
OHSAS -- Occupational Health and Safety Management Certification is an international standard which provides a framework to identify, control and decrease the risks associated with health and safety within the workplace. Implementing the standard will send a clear signal to your stakeholders that you view employee’s health and safety as a priority within your organisation.
ISO 9001 2015
“Manufacturing ,Testing and Supply of Aluminium conductors ( AAC, AAAC, AACSR, ACSR ) for overhead transmission and distribution upto 765KV Transmission Lines and Copper conductor used for Railway infrastructures”