Est. 1973
The Indian government has set very high targets for the power sector in the 13th five-year plan, besides trying to achieve the target set for the 12th five-year plan. Consequently, the transmission network will have to match the installed power generation capacity. But while there has been an increase in demand for Electrical Power Generation & Transmission, there exist a few hindrances, which include:
-
High cost to install new Power lines
-
Difficulty in acquiring Tower sites
-
Right of way (ROW)
-
Time involved in constructing new Power lines
-
Provision for future contingencies


Est. 1973

SCL HIRING 2026
Drop Your CV : info@shashicables.com
Job ID: SCL/302
1.International Sales Executive (Desk-Based) (02 Positions)
Experience: Minimum 3 Years
Key Responsibilities:
•Handle export sales of OH line conductors and T&D products.
•Drive export growth in EU, North America, and Oceania markets.
•Generate & manage overseas enquiries up to order closures.
•Ensure timely order processing and execution in coordination with production and logistics.
•Ensure high level of customer satisfaction and build relationship.
Job ID: SCL/303
2. Sales Executive – Technical (HTLS & OH Lines) (02 Positions)
Experience: Minimum 3 Years
Key Responsibilities:
•Design HTLS conductors using PLS CADD.
•Select cost-optimized conductor solutions for customers.
•Prepare techno-commercial proposals with GTPs.
•Hold technical discussions with utilities, EPCs, and developers.
•Support OH line design for renewable evacuation projects.
Job ID: SCL/304
3. Sales Manager – EPC (Renewables & T&D) (01 Position)
Experience: Minimum 5 Years
Key Responsibilities:
•Set up EPC business for T&D lines and substations.
•Build relationships with utilities, EPCs, and renewable developers.
•Lead bid preparations and orders acquisition.
•Identify and develop opportunities in renewable evacuation infrastructure.
