Est. 1973
The Indian government has set very high targets for the power sector in the 13th five-year plan, besides trying to achieve the target set for the 12th five-year plan. Consequently, the transmission network will have to match the installed power generation capacity. But while there has been an increase in demand for Electrical Power Generation & Transmission, there exist a few hindrances, which include:
-
High cost to install new Power lines
-
Difficulty in acquiring Tower sites
-
Right of way (ROW)
-
Time involved in constructing new Power lines
-
Provision for future contingencies
Est. 1973
HISTORY
Incorporated in the year 1973 named Anand Cables & Conductor Ltd.In 1996 the name of Co. was changed to Shashi Cables Ltd.
In 1998,shifted to our present premises at A-3 Amausi Industrial Area, Lucknow opposite Chaudhary Charan Singh International Airport, Lucknow
INFRASTRUCTURE
Total occupied area of the Factory is 2.25 lacs sq.ft.
Our organization is facilitated world-class machines with a spacious warehouse that aids in systematic and safe storage of the raw material and finished goods.
Grid Power 400 KVA at 11KV