Est. 1973
The Indian government has set very high targets for the power sector in the 13th five-year plan, besides trying to achieve the target set for the 12th five-year plan. Consequently, the transmission network will have to match the installed power generation capacity. But while there has been an increase in demand for Electrical Power Generation & Transmission, there exist a few hindrances, which include:
-
High cost to install new Power lines
-
Difficulty in acquiring Tower sites
-
Right of way (ROW)
-
Time involved in constructing new Power lines
-
Provision for future contingencies
Est. 1973
Quality
A team of qualified personnel with requisite testing instruments conduct tests on as per the Quality Assurance Plan duly approved by the customers or as per the specifications of client ensuring desired properties of Chemical, Electrical and Mechanical in the Conductor.
All acceptance and routine tests are carried as per IS 398-Part-1,2,4&5 and the Type tests of the Conductors from leading & recognized laboratories viz. NSIC,Kolkata,M/s TAG Corporation, Chennai and ERDA,Mumbai.
CERTIFIED
ISO 9001 2015
Design, Engineering, Development, Manufacturing, Testing, Supply, Erection and Commissioning of Aluminium & Aluminium alloys conductor (AAC, ACAR, AAAC, ACSR, AACSR, AL-59, ECO, HTLS, HPC, ACSS, TACSR, GTACSR, GzTACSR, STACIR, Carbon-Fiber Composite Core and GAP) For Overhead Transmission and Distribution Power line systems, Overhead Bare Wire, Earth wire, Shield wire, Stay wire, HDGC wire, Catenary wire, Dropper wire, Jumper wire, Bridle wire, Hard Drawn & Annealed stranded copper conductor and Cross Feeder wire made out of Copper and Copper alloys for Railway Infrastructure.