Est. 1973
The Indian government has set very high targets for the power sector in the 13th five-year plan, besides trying to achieve the target set for the 12th five-year plan. Consequently, the transmission network will have to match the installed power generation capacity. But while there has been an increase in demand for Electrical Power Generation & Transmission, there exist a few hindrances, which include:
-
High cost to install new Power lines
-
Difficulty in acquiring Tower sites
-
Right of way (ROW)
-
Time involved in constructing new Power lines
-
Provision for future contingencies
Est. 1973
Who we Are
In 1971 Anand Cables Conductors a partnership firm was constituted which started manufacturing of ACSR from 1973. In 1981 the firm was converted into a public company named as Anand Cables & Conductors Ltd.
In 1996 the name of the company was changed to Shashi Cables Limited.
Manufacture of distribution conductors spans a period of over three 30 years while multi-strand and
AAAC Conductors are in production for over 10 years.